
©2019 Hestan Commercial Corporation
6
EN
BACK AND SUPPORT WALL ASSEMBLY
(continued)
1/4-20 x 1/2” BOLTS
& NUTS HERE
MAIN ELECTRICAL BOX
ROUTE THIS BOX
BETWEEN THIS SPACE.
ATTACH TO THIS WALL ON
2 STUDS AT REAR OF BOX.
ARROWS
POINTING UP
4. Attach support wall #1 to curb assembly and back wall as shown using 6 each 1/4-20 x 1/2” hex
bolts and hex nuts where needed. Do not fully tighten bolts yet. Route the main electrical box as
described below and attach using 2 each 1/4” hex nuts.
5. Install remaining support walls as you did in step 4. Each wall is numbered and has a corresponding
number on the curb and/or rear wall for ease of locating. (8 foot Outdoor Living Suite shown)
Do not fully tighten bolts yet. Note all arrows are pointing up.
Summary of Contents for GES08
Page 22: ...2019 Hestan Commercial Corporation 22 EN RECOMMENDED STONE DIMENSIONS...
Page 23: ...2019 Hestan Commercial Corporation 23 EN RECOMMENDED STONE DIMENSIONS continued...
Page 24: ...2019 Hestan Commercial Corporation 24 EN RECOMMENDED STONE DIMENSIONS continued...
Page 25: ...2019 Hestan Commercial Corporation 25 EN RECOMMENDED STONE DIMENSIONS continued...
Page 26: ...2019 Hestan Commercial Corporation 26 EN RECOMMENDED STONE DIMENSIONS continued...
Page 27: ...2019 Hestan Commercial Corporation 27 EN RECOMMENDED STONE DIMENSIONS continued...
Page 28: ...2019 Hestan Commercial Corporation 28 EN RECOMMENDED STONE DIMENSIONS continued...
Page 29: ...2019 Hestan Commercial Corporation 29 EN RECOMMENDED STONE DIMENSIONS continued...