HermanMiller HZ138 Installation Manual Download Page 3

Agile Wall

Assembly Instructions

1BVDJ2 rev A

3

Step 1: Frame to base connection

1.1 Set the frame assembly on to the base assembly  and secure 

with (4) M8 Machine screws per side.

20

.5N

m or S+1

/2

6

Step 2.1: Install tiles on one side of the frame

2.1.1 All tile types (fabric and markerboard) install on to the frame 

the same way. Starting with the lower tile, hold the tile flat against 
the face of the frame so that the hook rails on the back of the tiles 

are just above the horizontal rails in the frame, then let the tile drop 
down so that the hook rail on the tiles engages with the horizontal 
rail on the frame.

Note

: The lower tile must be installed first before the upper tile can 

be installed.

Step3:

3.1  If a markerboard tile is being installed, the marker tray must 

be installed to the markerboard tile before installing it on the frame. 

Align the flange of the tray with the pre-drilled holes on the back 
side of the markerboard tile and install the self tapping screws. 

Note: 

Be careful not to over tighten the screws.

Note:

 Install the center screw first to locate tray left right.

Step 2.2:

2.2.1 Remove the thumb screws from the top channel on top of the 

frame. Remove the top channel by sliding the channel over and then 
lifting it up and install the tiles.

Summary of Contents for HZ138

Page 1: ...on about our products and services or to see a list of dealers for assistance please visit us at www hermanmiller com or call 888 443 4357 2021 Herman Miller Inc Zeeland Michigan Printed in U S A Part No 1BVDJ2 A Notice Some of the parts have been wrapped to protect them during shipping Remove the plastic wrap before assembling the product Tools Required Counterweight Frame Frame for full height s...

Page 2: ...ll instructions before using this furnishing DANGER To reduce the risk of electric shock always unplug this furnishing from the electrical outlet before cleaning or relocating CAUTION Risk of Electric Shock This unit may have up to two power supply cords Unplug all cords before moving testing or servicing this furnishing WARNING To reduce the risk of burns fire electric shock or injury to persons ...

Page 3: ...n so that the hook rail on the tiles engages with the horizontal rail on the frame Note The lower tile must be installed first before the upper tile can be installed Step3 3 1 If a markerboard tile is being installed the marker tray must be installed to the markerboard tile before installing it on the frame Align the flange of the tray with the pre drilled holes on the back side of the markerboard...

Page 4: ... Remove the thumb screws and the top channel from top of the frame 5 2 Install the two monitor mount support arms by sliding them down through the slots at the top of the frame as shown 5 3 Attach the support brackets to the support arms using the M8 machine screws and nuts Attach the brackets in the appropriate holes based on the desired monitor location and orient the bracket based on a single m...

Page 5: ... base Lower Rail Orientation for 1 monitors Orientation for 2 monitors at same height Orientation for 2 monitors at dierent height 5 9 Attach the bracket and AC Splitter to the rail as shown and secure with self tapping screws 5 6 Install the counterweight blocks in the pockets 5 7 Bend flange upat both ends 5 8 Re install the rail and base cover Nm orS 2 0 5Nm or S 1 2 6 ...

Page 6: ... Attach the bracket and AC Splitter to the rail as shown and secure with self tapping screws Nm orS 2 0 5Nm or S 1 2 6 5 11 Run the AC cord up through the holes in each rail 5 13 Add tiles for Tv option 5 12 Run the AC cord up through the holes in frame ...

Page 7: ...g screws on the brackets so they will clear the flange on the pan Lift the monitor with the brackets installed up to the plate and engage the bracket slots with the flanges on the support plate Tighten the screw at the bottom of the bracket to prevent the monitor and the brackets from lifting off 5 16 Fasten the 2 monitor mount brackets to the back side of the monitor into the threaded holes exist...

Page 8: ...1 2 3 6 5 AC cable routing from TV power strip down through rails and across to outlet 6 4 Install the Lower Bachmann power option 5 Nm or S 1 2 2 Disassembly for Recycling Materials Identification and Segregation Where possible plastic components are marked with ASTM recycling codes Use these codes to identify material type for recycling Non marked components should be treated as mixed plastic Fe...

Reviews: