Brick Installation
The side brick must be installed in the stove as per the respective drawings. Note the rear
top rear brick are held in place with a brick retainer bolted to the a secondary air channel.
Fibreboard Baffle Installation
Remove the top two notched rear bricks from the stove to assist in sliding the fibreboard
into position as per the drawings. Thefibreboard sits on a ledge attached to the secondary
air channel and on top of the side brick.
Front of
stove.
1
4
1
1
8
2
One #1 brick and
one #3 br ick ar e
removed for clarity.
4
1
1
1
3
2
(2) Brick retainers required for 2100, 2600 & Bayflame
(4) Brick retainers required for 3000.