Seite 24 von 26
1_HBS_Betriebsanleitung_022018-de-eng
Stand: 22. Mai 2018
Bedienungs- und Wartungsanleitung Hydrospeicher HBS
Instruction and Maintenance Manual Hydro Accumulator HBS
GB
9.1 Filling pressure P
0
check
After commissioning, check the filling pressure P
0
once a week in the first month.
Then repeat the exam monthly, twice a year, annually, depending on the detected pressure drop.
9.2. Other maintenance
HENNLICH - HCT recommend to carry out the following checks
(depending on the test distances and the operating conditions):
- verification of the safety instructions and the connections
- models with vent screw have to be regularly checked for strength and tightness
- checking of the fixings
- visual inspection of the accumulator with regard to possible signs of wear, such as
corrosion or deformation
- if you use an abrasive or corrosive liquid, an internal checking for wear is required, in
dependence from aggressiveness of the liquid
- the hydraulic accumulator is subject of regular internal and external audits in
accordance with legal regulations
Repair work must be performed in accordance with the underlying maintenance
manuals.
For repair or maintenance must be used only original spare parts of the manufacturer.