8
4
Installation
Before using the equipment for the first time check it carefully for signs of
external damage. If any shipping damage is found DO NOT USE THE EQUIPMENT
–
return it to your supplier immediately.
4.1 Environmental and Operating Conditions
-
Keep product feedline as short as possible. The shorter the feedline the smaller the
specific resistance and lower the dispensing pressure can be. Avoid kinking of the
feedline.
-
Use flexible pneumatic hoses and Loctite supplied product feedlines to prevent
unnecessary loads on the fitting and to ensure compatibility.
-
Keep all fitting tight.
-
No direct sunlight; no UV light.
-
No condensing humidity.
-
Avoid direct contact with water.
4.2 Connecting the Unit
-
Use only the cable and hose sets supplied.
-
Connect the regulated air pressure supply from the reservoir P in (7) to pneumatic
connection P out on the controller.
-
Connect the tank cord to the 9 pin D-sub connector XS2 (8) located on the rear
panel of reservoir as well as to socket on the controller.
-
Insert feedline through the reservoir lid to the dimension shown below. Alternatively
use the reference line shown on the housing to set the feedline length. Cut the end
of the feedline at an angle as shown below.