
- 7 -
12. Disconnect the master
spray/hold connection and insert
the tee connector from the
AutoMate interface cable
Fig. 9: Master spray/hold tee
inserted
13. Locate the ground terminal
under the Spra-Coupe dash and
connect the two white ground
wires from the AutoMate
interface cable.
14. Connect red power wires from
the AutoMate interface cable to a
secure source of switched
power.
Fig. 10: Ground wires connected
15. Connect the Power and Control
connectors of the Interface
Cable (A) to the AutoMate
console.
16. Secure all wiring with tie-straps
and clean up the installation.
Fig. 11: AutoMate console
17. In order for AutoMate to have
control of the boom sections the
rate controller Master Switch
must be in the ON position and
all individual boom switches
must be OFF.
Important: If the conditions of
step 16 are met, AutoMate will
begin to spray if 1) AutoMate
recognizes that it is in an un-
applied area and 2) AutoMate
recognizes a positive ground
speed.
Negative Signal
Wire