710-0130 IG-880-SH / S880-H 3-4 Person IR Sauna
Page 11
01/18/16
Ver. 2 Rev. 3
Once the Ceiling panel is lined up directly above the Wall panels; insert the wires harnesses
from the wall panels into the holes in the Ceiling panel.
Note:
Position the cam locks on the top of the Left & Right Wall panels as shown above.
Front Wall Glass (Box #2):
Place the Right Side Front / Door panel into the Floor panel slot.
Note: Do not let go of glass panel, it needs to be held in place.
While carefully still supporting the Front Wall Glass, one person on each side.
Lower the Ceiling panel onto the Walls & Glass panels.
Glass panels must recess into the slot in the Ceiling panel.
Make sure the ceiling fits tight and is flat and level.
Turn the wood ceiling cam locks to lock the ceiling into place.