background image

                                                                                                                                                                                                       

6

                   

 

                                              Picture 3                                        Picture4 
6. Place the front panel in the slot of floor panel, then lock the two inside latches between front 

and right side panel and between front and left side panel. 

   

 

 

7. Place the top panel on the five side panels. Make sure the connection wires of three side 

panels (left back, right back & front) protrudes through the corresponding holes of the top    
panel.  

  Make sure the top panel’s arched side is facing to the front. 

  Make sure the wire is through each hole smoothly and completely. 

  Make sure the trim of the top panel fits completely around the five side panels. 

   

   

 

8. Make sure each of the lead wires on the top of the left back, right back and front panels is   

protruding through the top panel; then plug each of the three lead wires into the three 
connectors of the top panel. 

Summary of Contents for HSI 70 CE

Page 1: ...E P R E C A U T I O N S F O R U S E 1 PA RT S N A M E S 2 R E A D B E F O R E I NS TA L L AT I O N 3 INSTALLATION OF SAUNA ROOM BODY 4 8 CONTROL PANEL INSTRUCTION 9 C O L O R L I G H T T H E R A P Y S...

Page 2: ...NG If you have any health problem or condition consult your physician for permission to use the sauna room health problem includes but is not limited to acute diseases malignant tumors high blood pres...

Page 3: ...2 PARTS NAMES...

Page 4: ...ith the button Refer to Picture 1 place the panel against the panel with button Refer to Picture 2 and then slide down the panel with button until the two panels are equal in height Refer to Picture 3...

Page 5: ...level before installing wall and ceiling panels If the surface is not level you may need to shim the bottom panel to get level Make sure lines grooves of the flooring of the floor panel are parallel w...

Page 6: ...that of the left or right back Panel at the bottom on right side into the white box A Refer to picture 2 Connect the power connector at the back of Long or Short Bench Support Panel and that of the l...

Page 7: ...ht back front protrudes through the corresponding holes of the top panel Make sure the top panel s arched side is facing to the front Make sure the wire is through each hole smoothly and completely Ma...

Page 8: ...7...

Page 9: ...ctrical outlet before connecting the plugs 9 Connect the power connector according to following 3 pictures before plug in 10 The power cord is located at the bottom of the back panel Simply plug into...

Page 10: ...efers to control of the set temperature and also indicates the actual temperature inside sauna room C F refer to the switching of C and F Once the control is turned on the indicated temperature of use...

Page 11: ...ode changing color every 8 seconds 2 Press ADJUST 2X Light system will glow GREEN 3 Press ADJUST 3X Light system will glow RED 4 Press ADJUST 4X Light system will glow BLUE 5 Press ADJUST 5X Light sys...

Page 12: ...utes beforehand After 15 minutes of preheating the temperature inside the sauna room should reach about 105 degrees F 40 C at this stage most people find the sauna a comfortable temperature to begin t...

Page 13: ...12...

Page 14: ...13...

Reviews: