![Hellenbrand H-125 HE Series Owner'S Manual Download Page 6](http://html1.mh-extra.com/html/hellenbrand/h-125-he-series/h-125-he-series_owners-manual_2121515006.webp)
6
• Do not use vaseline, oils, other hydrocarbon lubricants or
spray silicone anywhere. A silicon lubricant may be used
on black o-rings but is not necessary.
Avoid any type of
lubricants, including silicone, on red or clear lip seals.
• Do not use vaseline, oils, other hydrocarbon lubricants, or
spray silicone anywhere. Teflon tape is not necessary on
the nut connection or caps because of o-ring seals.
• The pipe size for the drain line should be a minimum of 3/4”.
Backwash flow rates in excess of 7 gpm or length in excess
of 20’ require 1” drain line.
1. Place the conditioner where you want to install it, making
sure it is on a clean, level and firm base.
2. Do all necessary plumbing (inlet to inlet, outlet to outlet and
drain line to drain). The control valve, fittings and/or bypass
are designed to accommodate minor plumbing misalignments
but are not designed to support the weight of a system or
the plumbing.
3. When assembling the installation fitting package (inlet and
outlet), connect the fitting to the plumbing system first and
then attach the nut, split ring and o-ring. Heat from soldering
or solvent cements may damage the nut, split ring or o-ring.
Solder joints should be cool and solvent cements should
be set before installing the nut, split ring and o-ring. Avoid
getting primer and solvent cement on any part of the o-rings,
split rings, bypass valve or control valve.
4. A jumper ground wire should be installed between the
inlet and outlet pipe whenever the metallic continuity of
a water distribution piping system is interrupted. Install
jumper ground wire on metal pipes.
5. The drain connection may be made using a 3/4” or a 1" female
adapter (see figure 6a). If soldering, joints near the drain
must be done prior to connecting the drain line flow control
fitting. Leave at least 6” between the drain line control fitting
and solder joints when soldering pipes that are connected
on the drain line control fitting. Failure to do this could cause
interior damage to the drain line flow control fitting.
6. The brine refill flow control assembly is installed in an easy
to access refill elbow located on top of the control valve.
The refill flow control assembly is attached to the control
valve with a locking clip. The locking clip allows the elbow
to rotate 270 degrees so the outlet can be orientated towards
the brine tank.
7. Connect the brine line found in the brine tank to the brine
connection on the control valve. The control valve has a
standard refill elbow which a 3/8” flexible tube can be con
-
nected, see figure 6a, page 6. (An optional elbow can be
ordered which accommodates a 1/2” flexible tube for a high
regenerant draw rate situation). Both elbows use the same
refill flow control and retainer. Do not connect the other end
of the brine line to the safety brine valve in the brine tank at
this time. Make sure the floor is clean beneath the salt tank
and that it is level and smooth.
8. A 1/2” (inside diameter) gravity drain line should be connected
to the overflow elbow on the side of the brine tank and run to
a drain below the level of the elbow. This overflow drainage
system provides protection from water damage in the event
of a brine shut-off malfunction. Tubing is not provided to
do this.
In all cases where an overflow could result in water dam
-
age for various reasons, this overflow protection must be
used. Do not connect the tubing to the drain line on the
control valve discharge line and do not run this line above
the overflow elbow height at any point. Provide air gap.
INSTALLATION INSTRUCTIONS
(All electrical & plumbing should be done in accordance to all local codes)
Figure 6a
3/4” Drain Line Elbow
1” Drain Line Connection
Figure 6b
Drain
Connection
Brine Line
Connection
Bypass