2.
5
mounting teChnique
drilling holeS for the braCketS:
Transfer the drilling outlines of the brackets to the determined bra-
cket positions.
When mounting the awnings,
s
elect the appropriate drill
bit for the respective
base material and mounting
method.
mounting on thermally inSulated faCadeS:
Insulating plaster and full multi-layer thermal insulation are not pres-
sure stable. Therefore, it is necessary to use backing for the entire
surface, or at least distancers for the area around the screws. The
accompanying figure explains a possible variant:
braCket mounting:
Loosely fasten all brackets and achieve true alignment. Even out irregularities of the base by using suitable spacers. Then tighten
all screws and check that brackets are firmly attached.
Reduce the projection of installation bolts to a minimum (max. 11mm),
otherwise it is impossible to hook in the awning.
Insulation protection taken out
Distance tube
www.helioscreen.com.au | Phone 1300 766 319
Helioscreen Rubix
• INSTALLATION GUIDE | 6