4 .3 Conversion Second room connection
- Accessory ELS-ZS or ELS-ZAS required .
Seal and make connection duct Aluflex/Steelflex DN 80 airtight.
4 .4 Conversion WC extraction
- Accessory ELS-WCS required .
Local regulations must be considered for the WC installation situation (Fig . 14)! The commissioning
without a filter is not permitted, otherwise the unit and entire pipeline will be contaminated .
The air treatment must be carried out by the customer! Make connecting ducting airtight and seal.
The foil insert from ELS-ZS could be used appropriately to adjust the air volume (consult factory) .
z
Fig .10
8
Casing types ELS-GUBA
Installation and Operating Instructions
Fig .11
ELS-GUBA Discharge to top, Connec-
tion for second room on left or right
ATTENTION
m
Fig .14
Ì
NOTE
+
Attach ELS-ZAS 80
connection spigot.
Pos. CLOSED
Fig .13
Attach ELS-
WCS
extraction
kit.
Pos. CLO-
SED
Fig .12
ELS-WCS extraction kit
DN 40
DN 30
DN 50
NOTE
+
Break out opening
for spigot in the
flush-mounted box on
right or left.
Fig .9
Break out opening for
spigot in the flush-moun-
ted box on right or left.
EN