
4.5
ELS installation description for installation in plasterboard
1. In order to simplify the positioning of the casing on the wall for the installation, four press pins are attached on the
casing bar (see fig. 18/19). They serve for the marking of the casing outline.
2. Align the casing with the planked wall in the desired position and mark by a tap on the back side (see fig.20).
3. Pencil casing outline (
c
230 x 230) on the wall (fig.21) and saw out accurately!
4. Afterwards mount plasterboard.
9
Fan-casing-type ELS-GUB..
Installation and Operating Instructions
fig.18
fig.20
2. saw out
c
230x230 mm
fig.21
4 press-pins
fig.19
Press-pin
fig.22
p
la
s
te
rb
o
a
rd
12,6 mm
6,6 mm
fig.23
Mounting of spacer frame-
ancillary ELS-AGR
for coverage of grubby or over-
sized wall chambers.
1.Marking
position!