Getting Started
Energy Manager 1.3 - Instruction Manual
19
4
Getting Started
4.1
Scope of Delivery
The following components are delivered by Heliocentris:
Energy Manager
Wiring board
Grounding cable (2 m)
Connecting cable (2 m) from Energy Manager
to –48 VDC distribution
Set of connectors
Sensors (optional)
TIP
On customer request Heliocentris takes responsibility for the delivery and
installation of all hardware and software components for power generation in
the telecommunication site.
4.2
Unpacking and Installation
To install the Energy Manager the following steps are necessary:
Unpacking and Visual InspectionInstallation in a 19-inch rack
Connecting sensor cables to wiring board
Grounding
Connecting the power supply
Inserting SIM card
TIP
A connection to an external power supply grid is realized exclusively by
the customer or a qualified company.
4.2.1
Unpacking and Visual Inspection
A delivery receipt is delivered with the device.
Check for the correct number as per delivery receipt.
Check all parts for external damage.