10 Certificate of conformity
10 Certificate of conformity
The contract firm which has installed the hold-open device must provide a declaration of the
conformity of the design type with the general building type approval for each construction
project. It must be in writing and must also contain at least the following information:
•
Z-No. of the building type approval used
•
Designation of the object of the general building type approval
•
Name and address of the contract firm
•
Designation of the building object
•
Date of construction / completion
•
Place and date of issue of the declaration and signature of the person responsible
The certificate of conformity must be handed over to the client for any necessary forwarding to the
responsible building supervisory authority.