17
Português
9.4 Total charging weight of the
refrigerant (after a leak, etc.)
The total charging amounts relate to the refrigerant
piping length.
Model
Refrigerant piping length (liquid side)
5-10m
(a)
10-20m
20-30m
30-40m
40-50m
50-60m
60-70m
70-75m
JZ100-A1
1.5 1.5 1.5 1.95 2.4
-
-
-
9.5 Add oil instruction
The cumout of oil added can be calculated by the
following formula :Q=(A+(L-30)*B)/4-C
mode
factory refrigerant
charge
recharge
quantity
factory oil
charging
A(g)
B(g/m)
C(cc)
JZ100-A1
1500
45
800
Note:
a. when Q£…0,oil added=0;
b. when Q£ 0,oil added=Q(cc);
c. L is the liquid pipe length, unit(m)
10. Electrical wiring work
WARNING
All wiring must be performed by an authorized
electrician.
All components procured on the side and all elecrtic
construction shall comply with the applicable
legislation.
DANGER: HIGH VOLTAGE.
To avoid electrical shock, make sure to
disconnect the power supply 1 minute or more
before servicing the electrical parts. Even after
1 minute, always measure the voltage at the
terminals of main circuit capacitors or electrical
parts and, before touching , make sure that
those voltages are 50VDC or less.
NOTICE
To persons in charge of electrical wiring work:
Do not oerate the unit until the refrigerant piping
is complete. (Running it before the piping is
ready will break the compressor.)
10.1. Precautions on electrical wiring work
When servicing the unit requires the refrigerant
system to be opened, treatment and evacuation
of refrigerant must be done in accordance with
applicable legislation. Refrigerant can not be charged
until field wiring has been completed
Refrigerant may only be charged after performing the
leak test and vacuum drying.
DANGER
Before obtaining access to terminal devices, all
supply circuits must be interrupted.
Be sure to install an earth leakage circuit breaker in
accordance with aplicable legislation. Failure to do
so may cause electrical shock.
Use only copperwires.
A main switch or other means for disconnection,
having a contact separation in all poles, must be
incorporated in the fixed wiring in accordance with
applicable legislation. Do not turn on the main switch
until all the wiring is completed.
Make sure to connect power supply cables in normal
phase.
Never squeeze bundled cables into a unit.
Fix cables so that cables do not make contact with
the pipes (especially on high pressure side).