background image

 

 

Please make sure that the earthing is not interrupted or destroyed when carrying out 
cleaning and maintenance work! 

 

 

3. Delivery & handling of the modules 

The goods must be checked immediately upon delivery to ensure completeness and integrity. Only damages which are 
noted  on  the  driver’s  delivery  receipt  and  are  immediately  communicated  in  written  form  to  Heckert  Solar  can  be 
recognised as transport damages.  

In general, our brand modules are packed upright on a one-way pallet of up to 30 or max. 19 modules. Take care when 
unpacking, transporting and storing the modules. We recommend keeping the modules in their packaging until ready 
for installation. Always set the pallets on a reinforced level ground and do not stack them under any circumstances. 

 

Standard   
packaging

 

Picking 
packaging

 

 

Number of modules/ 
pallets

 

20-30 

1-19 

 

External dimensions 
(W x L x H)

 

1.2 m x 1.16 m x 1.94 m 

1.2 m x 1.16 m x 1.94 m 

 

Weight of full pallet 

 

660 kg 

430 kg 

 

Quantity per truck 

 

22 pallets * 30 modules = 660 pcs. 
 

22 pallets * 19 modules = 18 pcs. 
 

 

 

 

The packaging is not film-wrapped and is therefore not resistant to rain! 

 

Please be sure to observe the unpacking instructions on the packaging! Never remove 
the rear retaining strap from pallets with 30 modules! 

 

 

Summary of Contents for NeMo 4.1 80 M

Page 1: ...Installation and operating manual PV Module NeMo 4 1 80 M www heckert solar com Status 08 2022 Standard 11 years product warranty Produced with green energy Made in Germany...

Page 2: ...ime Heckert Solar reserves the right to amend the present document at any time without prior notice Please use the most current copy which can be found on our homepage at https www heckertsolar com se...

Page 3: ...e output of solar modules decreases considerably as the modules heat up Rear ventilation avoids yield impairing heat accumulation The so called chimney effect draught behind the modules should not be...

Page 4: ...care when unpacking transporting and storing the modules We recommend keeping the modules in their packaging until ready for installation Always set the pallets on a reinforced level ground and do not...

Page 5: ...ard ground Do not set the modules down on their corners Do not place the modules on top of each other unprotected Do not place any objects on the modules Never stand on the modules Do not allow the mo...

Page 6: ...not use any lenses or mirrors to concentrate light risk of overheating Avoid damage to the module from using carbide or diamonds Protect solar modules from overvoltage e g voltage peaks from battery...

Page 7: ...mounting rails Ensure that the connector sockets and cables when necessary are not damaged or exert pressure on the cells The total snow load on the ground sk in kN m results from the respective snow...

Page 8: ...re 2400 Pa Pressure 8100 Pa Pressure 5400 Pa Suction 2400 Pa Suction 1600 Pa Suction 2400 Pa Suction 1600 Pa Clamp short side A 150 B 150 4 fixing points in the corners internal clearance A 10 B 200 T...

Page 9: ...r the crimping of connectors Defective crimped connections may cause significant damage to the modules and could even cause the plant to burn down The modules are connected to the strings in series Th...

Page 10: ...e 5 Connected MC4 modules The string cables are connected to the MC4 connectors on the first or last module in the string The connectors comply with IEC 62852 Please be sure to observe the requirement...

Page 11: ...rings and should be laid together When connecting the strings to the inverter ensure that its polarity is correct The and cables must not be interchanged Using a multimeter voltmeter the polarity and...

Page 12: ...arried out using a spring washer or toothed washer to ensure that the anodized layer is penetrated Figure 8 Equipotential bonding symbol and execution Functional earthing Functional earthing is requir...

Page 13: ...aimer These installation and operating instructions apply to general installations All information is supplied without guarantee Heckert Solar GmbH shall assume no liability for the usability and func...

Page 14: ...32 6029 156 Conductor cross section 4 6 IO mm2 Type PV AZM 4 I0 Order no 32 6027 410 ill 2 Crimping pliers PV CZM incl locator and built in crimping insert Crimping range 1 5 2 5 4 mm2 14 12 AWG Type...

Page 15: ...n ended spanner ill 8 SW 12 Torque wrench Preparing the line Connecting lines with a stranded wire construction of classes 5 and 6 can be connected Warning Do not use bare or already oxidised conducto...

Page 16: ...emove the insulation of the cable over a length of 6 0 to 7 5 mm Warning Do not cut any individual wires when stripping Note 1 In order to use the stripping pliers PV AZM and replace the sets of blade...

Page 17: ...e crimp die ill 13 Insert the stripped cable until the insulation touches the crimp insert Close the crimping pliers completely ill 14 Visually check the crimping Note please refer to the operating in...

Page 18: ...nted the white marking on the test pin must still be visible ill 17 Hand tighten the cable gland with the PV MS tools or tighten the cable gland with the PV WZ AD GWD and PV SSE AD4 tools In both case...

Page 19: ...cable coupling without securing sleeve PV SSH4 Plugging ill 20 Plug the cable coupling together until it engages Check that it engages correctly by pulling on the cable coupling Unplugging The cable...

Reviews: