
45
Heatilator • CRAVE4836-C/ST-C, CRAVE6048-C/ST-C, CRAVE7260-C/ST-C, CRAVE8472-C/ST-C Installation Manual • 2601-980 Rev. N • 11/21
6
6
Appliance Preparation
CAUTION! Risk of Cuts, Abrasions or Flying Debris.
Wear protective gloves and safety glasses during
installation. Sheet metal edges are sharp.
WARNING! Risk of Fire!
DO NOT attach elbow directly
to the appliance.
•
The CRAVE4836-C/CRAVE4836ST-C, CRAVE6048-C/
CRAVE6048ST-C and CRAVE7260-C/CRAVE7260ST-C
require a minimum of
18
inches of vertical venting before
attaching any elbow to the appliance.
• The CRAVE8472-C/CRAVE8472ST-C requires a
minimum of
30 inches of vertical venting before attaching
any elbow to the appliance.
4. Place the 1/8 inch thick, square fiberglass gasket over
the initial vent section.
5. Place the fiberglass rope ring over the gasket. Ensure
both the gasket and the rope ring are seated on the top
of the appliance. See Figure 6.2 and Figure 6.3.
Figure 6.3 Location of Fiberglass Rope Ring
Figure 6.3 Fiberglass Rope Ring Installed
GASKET
GASKET
ROPE RING
ROPE RING
A. Top Standoff Preparation
1. Rotate the four (4) top standoffs up into vertical position.
60 and 72 only:
Push the standoff support tab on each
standoff toward the center of the appliance and fasten
it in place using the supplied screw and pilot hole. See
Figure 6.1.
2. Place a vent section on the starting collar.
LOCATION FOR INSTALLATION OF
FIBERGLASS ROPE RING
Figure 6.1 Standoffs Shown in Vertical Position
(See-Through Appliance Shown)
Standoff Shipping Position
Standoff Installation Position
TOP STANDOFFS
TOP STANDOFFS
STANDOFFS
STANDOFFS
DOWN
DOWN
STANDOFFS
STANDOFFS
UP
UP