Heater Sports HittingStation 1 Instructions Manual Download Page 4

ASSEMBLY INSTRUCTIONS

BATTING TEE (Cont.)

STEP 3 - 

Screw the 

STEM (Parts E-G) 

onto 

PART B 

by twisting clockwise until tight, as  

 

     shown in 

FIGURE 4

.

 

 

     NOTE: The push pin should align with the back of the 

BASE

 when fully tight- 

 

 

      ened and allow you to adjust the height of the tee by selecting the 

 

 

      various hole positions on the 

STEM.

FIGURE 4

STEP 4 - 

Push 

PART H (Tee Top) 

onto 

PART G (Top Stem) 

until it stops

 

     as shown in 

FIGURE 5

.

 

     

 

     NOTE: P

ART H (Tee Top)

 is reversible and can fit either way.

FIGURE 5

PART H

STEP 5 - 

You can now fill the BASE with sand or water to keep the 

 

     batting tee from tipping over. 

 

     After filling the 

BASE

,  push 

STOPPER (Part D)

 into the

 

     fill hole until it snaps tight.

 

     The HittingStation #1 Tee is now fully assembled.

95 West 650 South • St. George, UT 84770 • Toll Free: (800) 492-9334 • [email protected]

page 4

PARTS E-G

PART A

PART D

Reviews: