![Heater Sports HittingStation 1 Instructions Manual Download Page 3](http://html1.mh-extra.com/html/heater-sports/hittingstation-1/hittingstation-1_instructions-manual_2116344003.webp)
ASSEMBLY INSTRUCTIONS
BATTING TEE
STEP 1 -
Make sure
PART A’s
bottom is touching ground
.
In the center hole
of
PART A (Base)
, Insert
PART C
into the three small holes
surrounding the center hole on top of base as shown in
Figure 1
.
PART A
PART C
STEP 2 -
Turn
PART A
upside down and insert
PART B
into the center recess
and align the lock holes with the three prongs of
PART C
as shown
in
Figure 2
.
NOTE:
Align
PART C
prongs with the large opening of the lock
holes in
PART B
as illustrated in
Figure 3
.
PART A
PART B
PART B
Once the parts are aligned, twist
PART B
counter clockwise until tight.
95 West 650 South • St. George, UT 84770 • Toll Free: (800) 492-9334 • [email protected]
page 3
FIGURE 1
FIGURE 2
FIGURE 3