![Heater Sports Deuce DC799 Owner'S Manual Download Page 5](http://html1.mh-extra.com/html/heater-sports/deuce-dc799/deuce-dc799_owners-manual_2116349005.webp)
Follow Step 1 to assemble all three legs for the pitching machine. (There will be 9 leg sections)
After assembling Pivot Arm and Housing, slide the 3 leg sections into the
Tripod Bracket Leg Supports and secure with the Thumbscrews (Part Q).
STEP 1:
Slide leg sections together (See illustration). Lock the sections together by
making sure the push pins line-up with each adjoining hole and lock into place.
Thumbscrew
(Q): 3x
LEG ASSEMBLY
Top Section E
Bottom Section C
Middle Section D
BALLFEEDER ASSEMBLY
HEATER
Section C
Section A
Section B
STEP 1:
Slide sections A - B - C together.
STEP 2:
Secure sections by installing ballfeeder hardware (S).
Insert bolt & washer from inside feeder and securing
with additional washer & nut on outside.
WARNING
• Turn off pitching machine and auto-ball feeder motor when loading balls.
• Make sure batter is ready before turning on auto-ball feeder and machine.
•
Make sure all persons stand clear of pitching machine and ball path.
•
Make sure all persons are aware pitching machine is throwing balls automatically.
• Make sure machine operator is ready to turn off auto-ball feeder power switch if necessary.
5
www.HeaterSports.com
800-492-9334