
40
Hot Gas Unit Cooler Typical Factory Piping
Electrical
Connections
(this side)
Note: Control contactors
mount under a cover
on front of unit (not shown)
Suction
Connection
Liquid
Connection
Liquid
Solenoid
Valve
Thermostatic
Expansion
Valve
Check
Valves
Check
Valve
Suction
P-Trap
Hot Gas
D
Shown
rain Pan
Air
Flow
Summary of Contents for Mohave
Page 13: ...13 Piping The following are examples of proper piping layout for typical system configurations...
Page 14: ...14 Piping...
Page 38: ...38 Standard Independent Evaporator Power Supply with VFD Condenser Fans Wiring Diagram...
Page 39: ...39 Standard Independent Evaporator Power Supply with VFD Condenser Fans Wiring Diagram...
Page 45: ...45 Defrost Operation Black Piping Inactive Gray Piping Active Hot Gas Defrost Cycle Diagrams...
Page 46: ...46 Defrost Operation Black Piping Inactive Gray Piping Active Hot Gas Defrost Cycle Diagrams...
Page 75: ...75 Notes...