®
Heat
Link
www.heatlink.com
16
SSPxx000x – SS Manifold Pump Panels
Installation, Operation, and Maintenance
Step 4
Lift and place the panel onto the supporting frame.
This panel is heavy; 2-3 person lift required.
Step 5
Complete the supporting frame by adding a top plate.
Be sure to drill corresponding holes in the top plate if any
knockouts were removed.
Step 6
Secure the panel in place by putting screws into each of the
mounting tabs.
Note: Panel contents are not shown in the diagrams.
Recessed Housing Mounting continued