3
ELBPxxTSxx
Installation, Operation, and Maintenance Manual
L6ELBPxxTSx 2022 DRAFT
®
Link
Heat
Step 1
Examine carton for any damage that may have occurred during shipping. If damage is visible
notify your courier and supplier immediately.
Step 2
Open the carton by removing the staples.
Step 3
Remove the cardboard spacers from the carton, then remove the panel from the carton. Lift
the panel by the base, not the enclosure.
Step 4
There are two screws holding the cover to the backplate. Remove these with a Philips head
screwdriver and put them aside.
• Level
• Screwdriver or power drill
• Flat head bit
• Phillips head bit # 2
• 2 adjustable wrenches (or 2 × 30mm wrenches)
This panel is heavy; 2-3 person lift required.
Any alterations to
electrical wiring and
controls renders warranty
null & void.
Installation must conform
to local codes. Check
valve(s) if required are the
installers responsibility.
Before servicing,
disconnect power
supply
M A D E I N C A N A D A
CAUTION
WARNING!!!
Consult Manual Before Use
AVERTISSEMENT!!!
Consulter le
manual avant l’usage
HeatLink Group Inc.
4603E - 13th Street NE
Calgary, Alberta, Canada
T2E 6M3
Phone: (403) 250-3432
Fax: (403) 250-1155
www.heatlinkgroup.com
Conforms to Std CAN/CSA C22.2 No. 14
Conforms to Standard UL 508
MADE IN CANADA
MODEL #: ELBP18
D.O.M: Nov 12, 2013
Max Pres: 125psi/862kPa
Volts: 120/24 VAC
Serial #: XXX-XXXX
Phase/Freq: 1/60 Cycles
Max Temp: 100C/212F
Amps: Maximum 15
3189472
SOME UNION NUTS MAY
BECOME LOOSE
AND CONSEQUENTLY
LEAK THROUGH
TRANSPORTATION
VIBRATION AND
HANDLING. DO NOT
OVERTIGHTEN UNION NUTS
WHEN CORRECTING THIS.
DO NOT
PLUG!
PRESSURE
RELIEF
VALVE
This pipe should
be extended to
within 6 inches of
the floor by the
installer.
LIVE
GR
OUND
NEUTRAL
CAUTION 115 VOLTS ONLY
FUSE
2
1
W
R C
W
R C
3
4
W
R C
W
R C
W
R C
W
R C
W
R C
W
R C
5
6
7
8
2
1
2
1
2
1
2
1
2
1
Pump
Boiler
Dry Contacts
R
R
R
C
Reset
24Vac
8 Zone Wired Module
40318
0
15
NC NO
Delay
Off
min
Actuator
®
Heat
Link
Unpacking
Installation Tools Needed
Unpacking