27
Heat & Glo • SL-550 / 750 / 950TR-E • 2118-900 Rev. AC • 3/15
Figure 7.6
H
2
H
1
V
2
V
1
Top Vent - Horizontal Termination
Venting with three 90º elbows
V
1
Minimum
H
1
+ H
2
Maximum
SL-550TR-E
SL-750TR-E
SL-950TR-E
V
2
V
1
+ V
2
Min.
90 Elbow **
2 ft.
610 mm
2 ft.
610 mm
2 ft.
610 mm
*
*
1/2 ft.**
152 mm
6 ft.
1.8 m
6 ft.
1.8 m
6 ft.
1.8 m
*
*
1-1/2 ft.** 457 mm 10 ft.
3.0 m
10 ft.
3.0 m
10 ft.
3.0 m
*
*
2-1/2 ft.** 762 mm 12 ft.
3.7 m
12 ft.
3.7 m
12 ft.
3.7 m
*
*
3-1/2 ft.
1.1 m
14 ft.
4.3 m
14 ft.
4.3 m
14 ft.
4.3 m
*
*
H
1
+ H
2
MAX. =14 ft. (4.6 m)
V
1
+ V
2
+ H
1
+ H
2
MAX. = 40 ft. (12.2 m)
*No speci
fi
c restrictions on this value EXCEPT V
1
+ V
2
+ H cannot exceed 40 ft. (12.2 m)
** See warning below
Note
: There MUST be a 25%
reduction in total H when using
fl
ex vent except when using the
simple up and out installation
(see Figure 7.3).
Fire Risk.
• When using SLP-HRC-SS and SLP-HRC-ZC-
SS termination caps on top vented
fi
replaces,
a one foot minimum vertical vent section is
required before installing
fi
rst elbow.
WARNING **
Note
: Use SLP Series
components only.
• When using DVP-TB1 termination cap on top vented
fi
replaces, a three foot minimum vertical vent section is
required before installing
fi
rst elbow.