G. Complete Installation
WARNING! Risk of Fire! You MUST maintain 2 in.
(51 mm) air space to insulation and other combustible ma-
terials around the chimney system. Failure to do so could
cause overheating and fire.
• Keep chimney sections from separating or twisting.
• You may secure straight chimney sections at the joints
with screws no longer than 1/2 in. (13 mm).
Figure 8.9 Ceiling/Attic Construction
H. Install Flashing
• Slip the flashing over the chimney.
• Nail the flashing to the roof. Keep gaps between flashing
plate and roof to a minimum.
NOTICE: Roofing shingles must be below the flashing
plate on the lower side of a sloped roof and over the
flashing plate on the sides and top.
• Caulk the flashing plate and roof junction as well as the
vertical seam on the flashing. All nail heads must be
caulked with a roofing sealant.
Heat & Glo • RUTHERFORD-42 • 4059-309 Rev L • 5/11
F. Cut Out Hole in Roof
• Refer to Figure 8.9.
• Plumb from roof to center of chimney.
• Drive a nail up through roof to mark center of pipe.
• Measure to either side of nail and mark the 17 in. x 17 in.
(432 mm x 432 mm) opening required.
• Measure opening on the horizontal; actual length may be
larger depending on roof pitch.
• Cut out and frame opening.
• Refer to
Chapter 25
of the
Uniform Building Code
for
roof framing details.