Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. i • 3/13
56
Note:
All
measurements
in inches.
MEASUREMENTS FROM
TOP EDGE OF THE OPENING
TO CEILING
5
10
11
12
2-1/2
13
14
15
16
17
18
19
32
9
10
11
12
8
7
6
5
4
3
25
18
MAX.
MIN.
See-Through Mantel Projection
PIER/LCOR/RCOR Mantel Projection
Note:
All
measurements
in inches.
MEASUREMENTS FROM
TOP EDGE OF THE OPENING
TO CEILING
5
10
11
12
1
13
14
15
16
17
18
19
32
9
10
11
12
8
7
6
5
4
3
25
18
MAX.
MIN.
B. Mantel and Wall Projections
WARNING! Risk of Fire! Comply with all minimum clear-
ances as specifi ed. Framing closer than the minimums list-
ed must be constructed entirely of noncombustible materi-
als (i.e., steel studs, concrete board, etc.) Failure to comply
could cause fi re.
Figure 13.12 Minimum Vertical and Maximum Horizontal
Dimensions of Combustibles
Figure 13.13 Minimum Vertical and Maximum Horizontal
Dimensions of Combustibles
MEASUREMENTS FROM
TOP EDGE OF THE OPENING
10
11
12
18
9
8
7
6
1
2
3
4
5
6
12
32
MAX.
MIN.
TO CEILING
MEASUREMENTS FROM
TOP EDGE OF THE OPENING
4
32
8
9
10
12
7
6
6
7
8
9
10
12
MAX.
MIN.
TO CEILING
Note:
All
measurements
in inches.
Note:
All
measurements
in inches.
Figure 13.14 Minimum Vertical and Maximum Horizontal
Dimensions of Non-Combustibles
Figure 13.15 Minimum Vertical and Maximum Horizontal
Dimensions of Non-Combustibles
PIER/LCOR/RCOR Mantel Projection
See-Through Mantel Projection