![Heartland RAINIER Assembly Manual Download Page 25](http://html.mh-extra.com/html/heartland/rainier/rainier_assembly-manual_2114821025.webp)
23
3" (7,6 cm) x12
Nail upper
PR
first, then place lower
PR
against
LV
and nail
PR
in place
with two 3" nails at each end.
Lay out two
PR,
two
PT
and one
LV
on edge on floor.
2
Ensure
LV
is centered with
PR
and nail in place with four 3" nails.
3
PARTS REQUIRED:
2 x 3 x 22-1/2" (5 x 7,6 x 57
cm)
You have finished building your Front Wall Frame.
FINISH
4
x1
x2
1/1/2"
(3,8 cm)
22-1/2"
(57 cm)
1-1/2"
(3,8 cm)
1-1/2"
(3,8 cm)
1-1/2"
(3,8 cm)
1-1/2"
(3,8 cm)
48-3/4"
(124 cm)
48-3/4"
(124 cm)
Use LV as a spacer
(do not nail).
(2) 3" (7,6 cm) Nails
at all connections.
Use LV as a spacer
(do not nail).
LV
PR
PR
PT
PT
2 x 3 x 94-1/2" (5 x 7,6 x 240 cm)
BEGIN
1
FRONT WALL FRAME
2 x 3 x 96" (5 x 7,6 x 244 cm)
x2
Flush
Flush
LV
PR
PT
DO
OR
HINT: