![HearthSong Quad Shootout Safety And Assembly Instructions Manual Download Page 5](http://html1.mh-extra.com/html/hearthsong/quad-shootout/quad-shootout_safety-and-assembly-instructions-manual_2114636005.webp)
Step 1:
Remove the lower rim #2 and all clip-on pieces #14, 15, and 16 from the frame. Fold the upper baskets at a 90 degree
angle to top. Adjust all spring lock buttons to the lowest position to collapse the pipes.
Step 2:
Following the steps shown in the figure, pull the sleeves out from the joints (location of #7 and 8) and fold the pipes
combo backward.
(continued on next page)
Folding Steps:
#16
#16
#2
#15
#15
#14
#
1
#
3
#
2
#
4
#
5
#
6
#
7
#
8