11
Healthway © 06/2019 All rights reserved.
Inlet Air Flow
Outlet Air Flow
Fig. 2-9
Fig. 2-10
Installation Procedures
SUPERV 5100 FURNACE INSTALLATION
Determine the correct air flow direction. The inlet air
is marked with an air flow label, the filter header and
high-energy grid should be placed on the inlet side
(Fig. 2-9 & 2-10)
a. If the furnace has a left-side opening, place the
air cleaner unit (default filter direction) on the left side
of the furnace
b. If the furnace has a right-side opening, pull off the
filter access door, flip the unit up-side down, put the
door back, and then place the unit on the right side of
the furnace
Hold up the snap latch, pull out the filter access door,
turn the quarter-turn counter-clockwise to unlock the
filter and slide out both filters
(the smaller filter comes out first) (Fig. 2-11 & 2-12)
Locate the mounting holes from the unit and connect
the unit to the furnace opening (Fig. 2-13)
If the furnace and air cleaner openings are different,
use a transition plenum (Fig. 2-14)
The opening on the Super V System is 32” ×22”.
Mount return ductwork to the unit (Fig. 2-15)
Slide both filters (Slide in the larger filter first)
into the housing from the front (Fig. 2-12)
Turn the quarter-turn clockwise to lock
the filter (Fig. 2-12)
Seat the Filter access door on the bottom snap latch,
hold up the top snap latch and push close the door
towards the housing. (Fig. 2-16)
Fig. 2-13
Fig. 2-15
Fig. 2-14
Fig. 2-16
Fig. 2-11
Fig. 2-12
Summary of Contents for SuperV 3400
Page 2: ......
Page 20: ...20 Healthway 06 2019 All rights reserved Appendix A1 120V with EAC...
Page 21: ...21 Healthway 06 2019 All rights reserved Appendix A2 120V without EAC...
Page 22: ...22 Healthway 06 2019 All rights reserved Appendix A3 208 480V with EAC...
Page 23: ...23 Healthway 06 2019 All rights reserved Appendix A4 208 480V without EAC...