5
ASSEMBLY
Assembly requires two persons. Place all parts of the elliptical exerciser in a cleared area and remove the
packing materials. Do not dispose of the packing materials until assembly is completed.
In addition to the
included allen wrenches, assembly requires a phillips screwdriver , two adjustable
wrenches , a rubber mallet , and pliers .
As you assemble the elliptical exerciser, use the drawings below to identify the small parts used for assembly.
The number in parenthesis below each drawing is the key number of the part, from the PART LIST on pages 24
and 25. The number following the key number is the quantity used for assembly.
Note: Some small parts may
have been pre-assembled. If a part is not in the parts bag, check to see if it has been pre-assembled.
M10 x 92mm Carriage Bolt (63)–2
M6 Washer
(64)–2
M10 x 25mm Button
Screw (114)–3
M8 Washer
(66)–2
M8 x 19mm Patch
Screw (111)–2
M6 x 48mm Flat
Head Screw (83)–4
M8 x 35mm Button
Bolt (105)–2
M8 x 42mm Button
Bolt (85)–4
M4 x 16mm
Screw (98)–4
M10 Nylon
Locknut (89)–4
M8 Nylon Jam
Nut (86)–6
M10 Split
Washer (57)–3
M10 x 105mm Carriage Bolt (115)–2
M4 x 16mm Round
Head Screw (96)–1
M6 x 16mm Patch
Screw (76)–4
Torque Washer
(113)–2
M8 x 63mm Bolt Set (65)–2
1. Identify the Front Stabilizer (8), which has Wheels (109)
attached to the front. While another person lifts the
front of the Frame (1), attach the Front Stabilizer to the
Frame with two M10 x 92mm Carriage Bolts (63) and
two M10 Nylon Locknuts (89).
While another person lifts the rear of the Frame (1),
attach the Rear Stabilizer (not shown) to the Frame
with two M10 x 105mm Carriage Bolts (not shown)
and two M10 Nylon Locknuts (not shown).
1
8
109
1
63
89