![headway EDB-2 H.E Instruction Manual Download Page 67](http://html.mh-extra.com/html/headway/edb-2-h-e/edb-2-h-e_instruction-manual_2112886067.webp)
•
Check that Power Switch is ON, Mute is OFF,
Gain control(s) and Master are turned up and
Jacks are fully home
•
Ensure batteries are in good condition and
connectors are pinched firmly on(,)the correct way
around. Ensure PSU is properly plugged in at both
ends. Warning light indicates less than a 7.3v
charge per battery
•
Use a meter/cable tester to check jack leads and
solder connections for resistance and good
connection
•
Make sure jack probes are straight and that the tip
contacts are not misshapen in any way
•
Check that XLR leads are wired correctly as
standard. See Specifications
•
If a socket is set too deeply recessed into an
instrument a jack plug may not make full contact
•
Check that mains supply is operating in chain of
power supply with earth connected at all points
•
It is recommended the best quality of connectors
be used. We recommend quality products: Neutrik,
Deltron & Schurter, Switchcraft, ST Professional &
GH. Headway offers quality jack leads with
appropriate lengths and specifications
•
If EDB-2 H.E has become overheated, turn off,
cool it down and try turning on a little later to re-
start, checking leads and connected devices. Try
changing or removing batteries
P.67