HDL
®
HDL-MWM70 Curtain Assembly Manual
www.hdlautomation.com
3
The curtain hook mounting position
:
Hook Unit
Fixed hole
Roller Runner
Master Carrier and its handle.
Host
、
Slave
:
Both host and slave are trietex, the host is connected to the HDL-BUS port and
AC220V, and provides DC12V to the slave by the 6-core RJ11. The standard
length of RJ11 wire is 1 meter.
Ceiling Bracket’s mounting distance
:
From both ends to the middle rail, recommend to install one ceiling bracket per
600mm(cannot greater than 600mm); in the middle rail, the distance between
ceiling bracket can be slightly long, the recommended distance is 800mm. (Due
to the load in the ends is big, the mounting distance of ceiling bracket need to be
short; the load in the middle rail is small, the distance of ceiling bracket can be
slightly long)
5.
Installation steps
(1) The length of the rail and the belt need to custom-made according to the size of
the window. If the length of the rail and the belt are too long, then need to cut. Rail
cutting: both rails need to cut to the half length of the window.( Notice: this step is
very important, don’t cut disorderly )
(2) Take out the belt, thread it into one of the rails, drag it to the drive unit, then pull it
out. At the end of the belt, insert the clamp1, then plug the fixture1.
(3) Adjust the position of the fixture1(as shown in figure), and insert the clamp2 to the
other side of the belt, next to the fixture1.
Clamp1
Fixture1