4 Planning and installation – Installing the heating system
33
9.
Screw down the M16 spindles (SW24) (1) on the four corners in
brief alternating turns until the boiler rests completely on the
floor.
10.
Align the boiler with plastic plates or flat steel strips (not included
in the scope of delivery) so that it is horizontal.
11.
Remove the installation aid.
✓
The HDG Euro 30/40/45/50 boiler has been placed in position.
R
EMOVING
TRANSPORT
SAFETY
DEVICE
1.
Remove the upper cover (1) by lifting it upward.
2.
Open the cleaning shaft lid (2).
Warning!
Danger of injury
If you screw a spindle on a corner down completely, there is the risk
that the boiler will tip over. This could cause serious injuries as well
as damage to the boiler.
Turn each of the spindles in alternating brief turns.
Figure 4/7 - Using the installation aid
1
The inner transport safety device
must
be removed from the
combustion chamber before commissioning. The outer transport
safety device may be left in the boiler.
Figure 4/8 - Removing transport safety device
1
3
2
4