Electrical connection
VK20A
A02335_03_Y00_00
HBM: public
19
5.1.8
Functional check
Three green control diodes for checking the wiring and a control signal push
button (for T20WN, T21WN) are integrated in the junction box.
Diode A1 comes on whenever a stabilized supply voltage of 12 V is made
available to the torque transducer. LEDs A2 and A3 flash whenever the input
shaft of the T20WN, T21WN turns slowly.
1
6
1
A2
A1
1
6
1
6
1
6
1
6
1
6
6
A3
S1
Control signal
Supply
voltage
Angle of rotation/
rotation speed
Fig. 5.5
Control LEDs and control signal push button
5.1.9
Control signal (T20WN, T21WN)
You can trigger a control signal of +10 V (
"
0.2 %):
S
with push button S1 on the board (as long as it is pressed;
).
S
with an external push button or relay point on strip terminal St7, terminals 3
and 4 (
).
S
with an external voltage (5 V...30 V) at strip terminal St7, terminals 2 and 3
(
Summary of Contents for VK20A
Page 1: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Fran ais VK20A...
Page 3: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Fran ais VK20A...
Page 26: ...Accessories 24 A02335_03_Y00_00 HBM public VK20A...
Page 27: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Fran ais VK20A...
Page 50: ...Zubeh r 24 A02335_03_Y00_00 HBM public VK20A...
Page 51: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Fran ais VK20A...
Page 75: ...Accessoires VK20A A02335_03_Y00_00 HBM public 25...