
8
HBM: Business Document
1. Lift the rotor out of the packaging, rotate horizontally by 180°, so that
the bigger flange is pointing upwards (see exemplary Fig 5.1).
Flange B
Fig 5.2:
Rotating the rotor
2. Place the rotor carefully onto a clean and stable table.
3. If the rotor is to be installed horizontally as shown in Fig 5.3, remove
one
mounting eye bolt. Both mounting eye bolts can initially remain in the
flange for vertical installation.
Fig 5.3:
Rotor installation (horizontal)
Summary of Contents for TJ1-S6
Page 21: ...15 HBM Business Document Fig 5 6 Dimensions of the control unit...
Page 28: ...22 HBM Business Document 8 Maintenance The torque transducer is maintenance free...
Page 29: ...23 HBM Business Document 9 Dimensions of the stator antenna...
Page 30: ...24 HBM Business Document 10 Dimensions of the rotor antenna...
Page 31: ...25 HBM Business Document...