
Mechanical installation
PW29
A03313_02_Y00_00
HBM: public
9
4
Mechanical installation
4.1
Important precautions during installation
S
Handle the transducer with care.
S
Welding currents must not be allowed to flow over the transducer. If there is
a risk that this might happen, you must use a suitable low‐ohm connection
to electrically bypass the transducer. HBM, for example, provides the highly
flexible EEK ground cable, which can be screwed on above and below the
transducer.
S
Make sure that the transducer cannot be overloaded.
WARNING
There is a danger of the transducer breaking if it is overloaded. This can cause
danger for the operating personnel of the system in which the transducer is
installed.
Implement appropriate safety measures to avoid overloads or to protect
against resulting dangers.
Notice
Load cells are precision measuring elements, and need to be handled carefully.
If they are dropped or knocked, the transducer may be permanently damaged.
Make sure that the transducer cannot be overloaded while it is being mounted,
either.
4.2
Mounting
Attach the load cells at the mounting holes and apply the load to the other end.
The screws and tightening torques to be used are given in the following table:
Summary of Contents for PW29 Series
Page 1: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Français PW29 ...
Page 3: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Français PW29 ...
Page 19: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Français PW29 ...
Page 37: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Français PW29 ...
Page 55: ...Dimensions PW29 A03313_02_Y00_00 HBM public 19 ...