USE ONLY GENUINE REPLACEMENT PARTS
Page 7 of 11
Saline C
™
Rev. C
Plumbing The System
Saline C systems require a minimum of 9 m
3
/h of flow through the electrolytic cell housing to achieve the rated production of chlorine. The system can
be plumbed with the full flow of the circulation system flowing through the cell housing or a bypass can be created to achieve 9 m
3
/h of flow through the
cell housing. In either case the cell housing must be installed as the last component in the return to the pool, after all other equipment. The vessel has 4
mounting holes for attaching to a floor or mounting surface. See the plumbing diagrams below.
SALINE C 6.0 System Plumbing
Bypass Manifold Plumbing
Chemical
Controller
Acid Feed
Tank
Heating
System
Saline C
Flow Sensor
Return Line
Saline C
Power Supply
Saline C
Electrolytic Cell
Chemical
Controller
Acid Feed
Tank
Heating
System
Saline C
Flow Sensor
Return Line
Saline C
Power Supply
Saline C
Electrolytic Cell