12x10 & 12x12 eCONO Apex & Apex
PLUS
Stable
FITTING INSTRUCTIONS
Fit the front height extension panel to the top of the front panel. The height extension panel bottom shiplap board oversails the bottom timber
and when in position the oversail shiplap needs to be nailed to the front panel top beam.
Temporarily fix using 100mm screws. Once you are happy with the position, fix using 3 x M8x100mm coach screws and washers. Fix from
underneath, also fix into the 2 sidewalls for additional support using 100mm screws.
Using the 40mm nails provided to fix the bottom shiplap board of the height extension panel to the top frame rail of the front panel.