background image

12x10 & 12x12 eCONO Apex & Apex 

PLUS

 Stable

 

FITTING INSTRUCTIONS 

 

 
 

 

Fit front panel to both side panels as below using 3 x M8x100mm coach screws and washers to each side - top, middle & 
bottom. Ensure the panel is level & upright. 

You can temporarily fix using 100mm screws and install the coach screws and 

washers when all 4 walls are fitted together and squared up.

 

Measure both internal diagonals to ensure they are both 

equal - this will ensure the building is square - DO NOT PROCEED UNTIL BUILDING IS SQUARE OR YOUR ROOF SHEETS WILL 

NOT FIT.

 

 

 

 

 

 

 

 

 

 

 

 

MUST BE EQUAL 

Summary of Contents for eCONO Apex

Page 1: ...uilding will be to install Fit left hand side panel to rear panel as below using 3 x M8x100mm coach screws and washers top middle bottom Ensure the panel is level upright You can temporarily fix using 100mm screws and install the coach screws and washers when all 4 walls are fitted together and squared up Approx 3 47m Approx 3 0m or 3 6m If your shelter has kick board lining you can use the square...

Page 2: ...screws and washers top middle bottom Ensure the panel is level upright You can temporarily fix using 100mm screws and install the coach screws and washers when all 4 walls are fitted together and squared up Approx 3 0m or 3 6m If your shelter has kick board lining you can use the square corner of a sheet to check the building is square ...

Page 3: ...ddle bottom Ensure the panel is level upright You can temporarily fix using 100mm screws and install the coach screws and washers when all 4 walls are fitted together and squared up Measure both internal diagonals to ensure they are both equal this will ensure the building is square DO NOT PROCEED UNTIL BUILDING IS SQUARE OR YOUR ROOF SHEETS WILL NOT FIT MUST BE EQUAL ...

Page 4: ...100mm screws once you are happy with the position fix using 3 x M8x100mm coach screws and washers from the underside of the top rail of the sidewall up and into the uprights on the gable ends The gable end bottom shiplap board oversails the bottom timber and when in position the oversail shiplap needs to be nailed to the side panel Using the 40mm nails provided fix the bottom shiplap board of the ...

Page 5: ...sition the oversail shiplap needs to be nailed to the front panel top beam Temporarily fix using 100mm screws Once you are happy with the position fix using 3 x M8x100mm coach screws and washers Fix from underneath also fix into the 2 sidewalls for additional support using 100mm screws Using the 40mm nails provided to fix the bottom shiplap board of the height extension panel to the top frame rail...

Page 6: ... of the gable end to stop any twisting The 2 purlins that fit on either side of the ridgeline have an add on to help to fit the ridge cap The add ons must sit facing the ridgeline Fix the purlins into the hangers using the 40mm galvanised nails provided Fit the front purlin centre support screw through face of front purlin into centre support using 2 x No 5x100mm screws Screw either side of the ce...

Page 7: ...ut a nail where the next sheet overlaps until the next sheet is fitted allow min one roll overlap Do not nail the top of the sheet at the first Apex purlin as this will be fixed when the ridge cap is fitted You may need to stretch sheets to fit the width of your stable exactly Repeat the above for the front section of the roof Install ridge caps nail through the bottom of ridge cap flat section an...

Page 8: ...5mm using 8 x No 5x70mm screws Fit stable door eCONO Apex door has Tee Hinges Brenton Padbolt eCONO Apex Plus has adjustable hinges animal shoot bolts both have 2 x cabin hook eyes 1 x kick over stable latch eCONO Apex Plus door Fix rides to door frame with No 5x70mm screws eCONO Apex door fix Tee hinges with No 5x70mm screws to frame No 5x70mm screws to doors All other door hardware is fixed with...

Page 9: ...S KICK BOARD LINING Install the kick boarding sheets following the design below the kickboards will have letters marked in pencil on them Start with the first board hard into the corner fix using 40mm galvanised nails Start with Ab finish with H A B C D E F G H ...

Page 10: ...as standard with guttering to the front of the stable install guttering as shown in the picture below use No 5x50mm screws Gutter stop end x 1 Gutter stop end outlet x 1 Gutter bracket x 4 Gutter 1 x 4 0m Down pipe shoe x 1 Down pipe bend x 3 Down pipe 1 x 2 5m 1 x 1 2m Down pipe brackets x 3 ...

Page 11: ... Apex PLUS Stable FITTING INSTRUCTIONS Completed stable PLEASE FIX YOUR STABLE DOWN TO STOP YOUR STABLE BLOWING OVER IN HIGH WINDS Bolt your stable down to the concrete slab using the 12 number M8x100 masonry bolts provided ...

Page 12: ...or hardware 2 x gable ends 1 x front height extension panel 8 x 45mm x 95mm roof purlins 2 x 45mm x 95mm roof purlins with side add on for purlins at ridgeline 1 x centre canopy support 21 x M8x100mm coach screws and washers 1 box 100 x No 5x100mm screws 1 box 100 x No 5x70mm screws 250 x roofing nails Kickboard lining 8 x individual kickboards labelled A through H 500g bag of 40mm galvanised nail...

Page 13: ...mm roof purlins 2 x 45mm x 95mm roof purlins with side add on for purlins at ridgeline 1 x front fascia board 18mm x 145 x approx 3 5m 1 x centre canopy support 21 x M8x100mm coach screws and washers 1 box 100 x No 5x100mm screws 1 box 100 x No 5x70mm screws 1 box 200 x No 5x50mm screws for guttering 350 x roofing nails Kickboard lining 8 x individual kickboards labelled A through H 500g bag of 40...

Page 14: ...ETY If you have chosen to fit your shelter yourself please be very careful during installation DO NOT INSTALL YOUR SHELTER DURING PERIODS OF HIGH WINDS MAKE SURE YOU WEAR YOUR PERSONAL PROTECTIVE EQUIPMENT not supplied PLEASE ENSURE THAT WHEN USING A LADDER THAT IT HAS BEEN INSPECTED AND IS FREE FROM FAULTS ALWAYS HAVE SOMEONE WITH YOU TO FOOT THE LADDER WHILE YOU CLIMB THE LADDER ENSURE THAT THE ...