HAWS
®
P/N 0580001083 Rev.2 11/21
Model 8730
Page 8 of 20
Checklist for start-up
CHECKLIST
Complete
OK
Inspector
Initials
Pre-connection Check
Check all components for any connections or connectors that may have loosened during
shipping.
System Flush (All Electrical Power off for System Flush)
Verify that the required water supply pressure is available at the Tepid-Water Inlet.
Drain is attached and able to handle a flow of 35 GPM.
Water is clear and free of any contamination, particles, or discoloration.
Connections
System is charged with water and all air is evacuated from the system.
Connect remote monitoring via plant control system (if applicable).
Applying Power to the System
Verify that the proper voltage is present.
Verify that equipment ground is properly connected.
Apply power to the system.
Verify that the space heater thermostat is set to 70º F (21ºC) (if applicable). Increase the
thermostat set point and verify that the heater is producing heat. Return the thermostat to
70ºF.
Verify that interior and exterior lights are illuminated (if equipped).
HAWS
®
Shower and Eye/Facewash
Flow water through an eyewash or shower.
Verify that the exterior light flashes at 1 second intervals and that the audible alarm sounds
(if equipped).
Press the alarm silence button and verify that the exterior light is flashing, and the audible
alarm is silent (if equipped).
Deactivate the shower or eyewash that is active, verify that the exterior light is not flashing,
and that the audible alarm is silent (if equipped).