4.3 Primary Schedule
4.3.1 Schedule with Time Lines
There are two time-lines of different scales:
hour unit time-line
and
week unit
time-line
. You can make your own schedule scheme by plotting markers in all
time-lines. These two time lines are associated with each other. That is, if you make
changes in one time-line, the corresponding changes will be applied, in scale, to the
other time-lines in the same schedule scheme.
4.3.1.1 Week Time-Line
Figure 4-5 shows the
Week time-line
. It includes the time-line, scheduling
information, and the selected day of the week.
Selected day
Figure 4-5 Week Time-line
4.3.1.2 Marking/Unmarking the Recoding Time
Result in hour time-line
Click
Figure 4-6 One-click on Week Time-line
The corresponding changes for the markers on the
week time-line
will be
automatically added to the
hour time-line
, as shown in Figure 4-6. You can also
mark and unmark the plotted bar by using the left and right mouse buttons.
4.3.1.3 Hour Time-Line
Figure 4-7 shows
Hour time-line
. It includes the time-line, scheduling information.