background image

www.havis.com   •   1-800-524-9900

6

7

Cable Management

1)

  Tip the Docking Station to a position that is comfortable to work with.

2)

  Install all cables that are necessary for computing needs.

3)

  Use Zip Ties (Hardware Kit Item 1) to strain relieve cables at rear of

      Docking Station.

4)

  Gather all cables to one side and tie off to unused holes on underside

      of Docking Station.

Insert as many zip ties as
necessary to secure cables.

Cable Management 

(continued)

5)

  Create a service loop with cables to ensure that no tension is on the 

      connectors and to enable intended motion.

6)

  Tie off cables onto a stationary part of the mounting system.

Collect cables and secure

to the mounting system.

(Note: mounting system not included)

This loop must be large enough 

to allow full range of expected 

rotation and extension without 

stressing connections. 

Summary of Contents for DS-PAN-211

Page 1: ...d Mobile Docking Station For Panasonic CF 19 Toughbook _3 12 www havis com 1 800 524 9900 DS PAN 211 DS PAN 211 2 DS PAN 212 DS PAN 212 2 DS PAN 213 DS PAN 214 DS PAN 214 2 DS PAN 221 DS PAN 221 2 DS...

Page 2: ...ULLY OPEN OR DAMAGE MAY RESULT Havis is pleased to provide this Owner s Manual to aid in the proper installation and use of the DS PAN 210 Series 220 Series Docking Station for the Panasonic CF 19 lap...

Page 3: ...tation where water moisture steam dust etc are present Do not connect cables into ports other than what they are specified for Do not leave the Docking Station in a high temperature environment greate...

Page 4: ...s 3 4 1 4 20 x 3 8 long Pan Head Screws 4 Tools required for installation 3 Phillips Drive For attaching Mounting Bracket to Docking Station with Pan Head 1 4 20 Screws 5 32 Hex Drive For attaching Mo...

Page 5: ...ll as most competitors 2 Lower the Docking Station to the Mounting Bracket as shown and secure with 4 1 4 20 x 3 8 long screws Hardware Kit Item 4 Torque screws to 120 in lbs 13 4 Nm 10 NOTE If mounti...

Page 6: ...re necessary for computing needs 3 Use Zip Ties Hardware Kit Item 1 to strain relieve cables at rear of Docking Station 4 Gather all cables to one side and tie off to unused holes on underside of Dock...

Page 7: ...ion is on the connectors and to enable intended motion 6 Tie off cables onto a stationary part of the mounting system Collect cables and secure to the mounting system Note mounting system not included...

Page 8: ...e appropriate recesses in the computer case 3 Lower back of computer onto Docking Connector 4 With computer seated on Docking Station rotate Latch Handle clockwise to the DOCK position Operation Docki...

Page 9: ...cking Station using supplied key 2 Rotate Latch Handle counter clockwise to the UNDOCK position 3 Once unlatched grab both sides of computer and carefully lift out of Docking Station rear end first Do...

Page 10: ...1 flat washer over each of the 4 6 32 screws 4 places 5 Place the Power Supply brick over the 4 6 32 screws ensuring that the screws pass through all of the bosses on the Power Supply brick and the c...

Page 11: ...r Clip from Upper Bracket and spread open tabs to allow insertion of USB Laptop Light cable into accessory retaining hole 2 Snap USB Powered Light into Screen Stiffener Clip so that top surface of Bul...

Page 12: ...Toughbooks with cigarette lighter adaptor DS DA 102 USB Powered Light Soft red LED light illuminates the laptop keyboard for night viewing DS DA 213 Card Reader Mounting Bracket Mount an E Seek Model...

Reviews: