![Havis DS-DELL-400 Series Owner'S Manual Download Page 6](http://html1.mh-extra.com/html/havis/ds-dell-400-series/ds-dell-400-series_owners-manual_2108678006.webp)
www.havis.com • 1-800-524-9900
6
7
Cable Management
Installation
1)
Remove the Mounting Bracket from the packaging. Install the
Mounting Bracket to the Motion Device using (4) 1/4“-20 x 5/8” long
screws (Hardware Kit Item 3). Torque screws to 80 in-lbs (9.0Nm) ± 10%.
NOTE: Numerous hole patterns present in Mounting Bracket will accomodate Havis Motion
Devices as well as most competitors’
1)
Orient the Docking Station in a position that is comfortable to work with.
2)
Install all cables that are necessary for computing needs.
Use Zip Ties (Hardware Kit Item 1) to strain relieve cables to the Strain
Relief Points, routing all cables together to the front of the Docking Station.
3)
Secure cable bundle to the Mounting Bracket with a supplied Zip Tie.
4)
Create a service loop with cable bundle to ensure that no tension is on the
connectors and to enable intended motion.
5)
Tie off cables onto a stationary part of the mounting system.
(Mounting system not included with Docking Station)
1/4”-20 Screws
Mounting Bracket
Typical Motion Device Example
(not included)
NOTE:
We recommend applying a drop of medium strength (blue)
thread locking adhesive to the threads of all fasteners.
2)
Lower the Docking Station to the Mounting Bracket as shown and secure
with (4) 1/4”-20 x 5/8” long screws (Hardware Kit Item 3). Torque screws
to 80 in-lbs (9.0 Nm) ± 10%.
1/4”-20 Screws
This loop must be large enough
to allow full range of expected
rotation and extension without
stressing connections.
Collect cables to secure
to the mounting system
(Note: mounting system not included)
Use as many zip ties as
necessary to secure cables.