- Operation instructions
5.6 -
LIFTING OPERATION
During loading / unloading operation, if it becomes necessary to lift the machine using an
overhead crane, it is important to respect the following :
• Put the machine in stowed position, boom and arm fully retracted and lowered.
• Ensure the platform is empty.
• Rotate the turret and the jib to the configuration in the photos below.
• Lock the turret with turret locking pin.
• Verify that lifting accessories are in good operation and match the technical specifications listed
below. It is important that the lifting devices are attached only to the designated lifting eyes.
• Each of the chains/slings used for lifting the machine must be adjusted to keep the machine level and
to minimize the risk of damage to the machine.
• Anchorage point for lifting are identified / labeled by the following symbol
.
• ONLY trained and authorized personnel should attempt to lift the machine.
Procedure for the use of slings
Never lift the machine with slings attached to counterweight.
Number of shackles
Number of slings
Length
Maximum load per
sling and shackle
A
4
4
5 m (16 ft 5 in)
3000 daN (6744 lbf)
Summary of Contents for HA120PX
Page 1: ...Operator s manual HA120PX 4000327280 E09 16 USA GB Operator s manual HA120PX ...
Page 2: ...2 4000327280 E09 16 USA GB HA120PX ...
Page 6: ...6 Operator s manual ...
Page 38: ...38 4000327280 E09 16 USA GB HA120PX B Familiarization Notes ...
Page 70: ...70 4000327280 E09 16 USA GB HA120PX D Operation instructions Notes ...
Page 84: ...84 4000327280 E09 16 USA GB HA120PX E General Specifications Notes ...
Page 90: ...90 4000327280 E09 16 USA GB HA120PX F Maintenance Notes ...