![Haug EN 8 LC Operating Instructions Manual Download Page 12](http://html1.mh-extra.com/html/haug/en-8-lc/en-8-lc_operating-instructions-manual_2107704012.webp)
5 Operate
12
5
Operate
Preconditions:
The discharging power pack and the ionizing unit are connected and
installed as specified in the operator instructions.
1. Switch on the discharging power pack using the mains switch.
• The signalling lamp will light up briefly to confirm.
• The mains switch will illuminate to confirm.
• The HV is switched on.
2. The discharging power pack is in operating mode.
3. The signalling lamp does not light up during operation.
NOTE:
In the event of a fault, the signalling lamp flashes to indicate this
status. Carry out chapter troubleshooting. Refer page 13.
Summary of Contents for EN 8 LC
Page 2: ......
Page 21: ...NOTES...
Page 22: ...NOTES...
Page 23: ......
Page 24: ...EN 8 LC v02gb docx V02 22 11 2017 D 0386 GB made by...