7
3. Pushing of steel weights into the ground tube:
a) Push from each side 2 steel weights of 1200 mm into the ground tube.
(In case of goal size 3.00 x 2.00 m push at first 1 weight of 600 mm, then
per side 1 weight of 1200 mm into the lower ground tube.
Push 2 weight of 600 mm into the upper short ground tube.)
Push exterior weights so far that there is a cavity of approx. 10 cm from
the outside edge of the ground tube to the interior weight.
b) Now the cavities at the ground tube ends have to be filled with the fitting
foam which is part of the delivery.
Carefully consider the instructions.
c) After the foam has set cut if off with the help of a knife. Then cut another
2 cm of the foam at the inside of the ground tube.
d) Fix 2 plastic caps 80 x 40 at each side of the ground tube. Use a mallet if
necessary.