background image

Step 11a - Fit the shelves (greenhouse, solar and 3-season)

One mesh shelf is supplied as standard for the greenhouse-only and solar models. Two mesh
shelves are supplied with the 4-season model, since the additional lighting allows plants to be

grown closer together.

Parts, per shelf
2 x shelf support

1 x mesh shelf
4 x cable tie

Slot the shelf supports into the slots on the inside of the side
panel cross bars.

Place the mesh shelves onto the shelf supports and secure

with cable ties.

NOTE:

The mesh shelf with a slot cut out goes in the top level to allow the lid li er piston to

swing clearly. The front shelf support goes in upside down.

Summary of Contents for Sprout S6 Mini

Page 1: ...Setup guide Model S6 V2 from Jan 2022 Greenhouse only model comes with one shelf...

Page 2: ...Exploded diagram Visit www harvst co uk setup for more information videos and photos...

Page 3: ...buying a Harvst greenhouse If you have any questions while setting up send us an email help harvst co uk or have a look at our forums at https grow harvst co uk There are also videos at https www harv...

Page 4: ...ont upper crossbar box profile as alternative 450mm x4 Side panel crossbar 728mm x2 Front upright 910mm x2 Rear upright 600mm x1 Lid front 420mm x1 Lid prop 610mm Shelf support x2 GH 3S Solar only 450...

Page 5: ...mm x2 M5 Nyloc x1 M5 nut x10 M5 square nut x16 4 5 x 30 screw x4 Blanking plug x10 M5 washer x2 Fixing bracket x2 10cm cable ties Lid top plate x1 Adapter plate x1 May be slot head M4 x 12mm x2 M4 nut...

Page 6: ...OFF THE HEAD WHICH IS NOT COVERED BY WARRANTY Step 1 Seal the polycarbonate panels optional Twin wall polycarbonate panels act like double glazing for your mini greenhouse and to improve the insulati...

Page 7: ...x door handle 2 x polycarbonate door Fix the door handles to the doors as shown in the drawing above using the tape fixed to the handles Make sure you have peeled the protective film off the doors fi...

Page 8: ...sily access the screws at the bottom such as a table or workbench The closed faces on the assembly uprights face outside the greenhouse The side base parts have the single channel facing up and the do...

Page 9: ...left side panel has a hole with grommets in it for an external hose or tank connection if you have a solar 3 season or 4 season model Parts 4 x clear side panel 4 x side cross bar 45cm two with nuts P...

Page 10: ...hannels on the uprights Screw the 10mm bolt into the square nut which is already in the outside channel of the assembly and tighten by hand This will form part of the storm lock see end of guide The f...

Page 11: ...to front bar slot method Parts 1 x front upper bar 60cm 1 x bracket assembly from above 2 x M5 x 8mm button head 2 x M5 square nut Slide two square nuts into the rear channel of the bar the side oppos...

Page 12: ...the greenhouse Tighten securely Optional step fit pipe clips If you have a greenhouse with self watering it will be easiest to fit the pipe clips before adding the mesh shelves Parts from control sys...

Page 13: ...g allows plants to be grown closer together Parts per shelf 2 x shelf support 1 x mesh shelf 4 x cable tie Slot the shelf supports into the slots on the inside of the side panel cross bars Place the m...

Page 14: ...lights using the cable tie holes If you have heater cables leave the attachment of the mesh shelves until after you have added the heating cable If you don t have heater cables place the mesh shelves...

Page 15: ...mm off the bottom and leave the other one near the top Holding the bolt thread tighten the nut to create a stud The lower front stud goes through the lid prop with a nyloc nut on it The top rear stud...

Page 16: ...e storm lock as per drawing below 2 Screw the 10mm bolts into the nuts and tighten them by hand to lock them in place 3 Fit the o ring over the two bolts on the side of the lid This is what the lock w...

Page 17: ...th the black channel facing up with the holes over the edge Parts 2 x M4 x 16mm bolt 2 x M4 nut 1 x lid top plate 1 x lid lifter Place the lid lifter so that the bracket with slots in is above the two...

Page 18: ...er bar Watch a video at www harvst co uk setup for more tips Step 20 Fit the ridge to the lid Parts 1 x assembled lid 1 x ridge 2 x plugs Fit the blanking plugs when the screws are fully tightened Ste...

Page 19: ...e position so that the doors slide well Step 23 Fit the hole caps We ve supplied some small black plastic caps to cover the screw holes in the front of the greenhouse to make it look smarter Now s the...

Page 20: ...se means that it does not need much maintenance The automatic lid lifter will need oiling from time to time to prevent corrosion Clean the inside of the panels from time to time especially if you have...

Reviews: