7
Installation of Mounting Brackets, Tank, and Drain / Fill Line (continued)
Locate the mounting bracket (001-4704KR) and fasten it to the outside of the U-Bracket (001-4704KB) shown
at point J in figure 10 using
3/8” x 1 ¼” bolts, locks, flats, and nuts. Drill a 3/8” hole in the baler tongue and
fasten 001-4704KR to the baler tongue using
a 3/8” x 1 ¼” bolt, lock, flat, and nut.
Locate the tank (005-4705T) as shown in figure 11 and fasten it to the tank bracket (001-4704KA) using six
5/16” x ¾” bolts, internal tooth lock washers, and flats. Tighten all hardware.
Figure 10
001-4704KA
J
001-4704KJ
001-4704KB
001-4704KR
001-4704KG
Figure 11