![HART Mums Planter Project Planning Download Page 6](http://html1.mh-extra.com/html/hart/mums-planter/mums-planter_project-planning_601410006.webp)
6
Step 4
Mark points for the countersink holes on the (2)
1” x 2” x 16-1/8” side inner top rails and (2) 1” x 2” x
12-1/4” side inner bottom rails. Follow diagram for
measurements.
Drill countersink holes in both sets.
Step 5
Take the (2) 1” x 3” x 14-1/4” shelf support boards
and mark for countersink holes on both ends. Follow
the diagram for measurements. The supports will be
symmetrical.
Drill countersink holes in both.
Step 6
Take the (4) 1” x 2” x 11-1/4” shelf slats, find the center
line, and mark a point 3/8” from each end.
Drill countersink holes at each point.
2"
3/8"
2"
3/8"
2"
3/8"
3/4"
1/2"
1/2"
3/8"
CL
(X2)
16-1/8"
12-1/4"
14-1/4"
11-1/4"