background image

© 2007 Harsco Corporation 
Printed:  3/18/2011 

 

 

 

 

MACH

®

 GAS-FIRED BOILER 

C750 - C900 - C1050 OUTDOOR 
BOILER GUIDE 

This manual is to be used in conjunction with the 
MACH

®

 C750-C1050 Installation & Owner’s Manual. 

 
 

 

 

 

 

 

 
 
 

Model #:_______   Serial #:_____________________ 
 
 
Installation Date:

 ___________________________________ 

 

 
 
Harsco Industrial, Patterson-Kelley 

100 Burson Street, East Stroudsburg, PA 18301 
Telephone:  570.476.7261 
Toll Free:  877.728.5351    
Facsimile:  570.476.7247    
www.harscopk.com 

 

 

 

MACH

®

 C750-C1050 Outdoor Boilers  

Rev. 1.0 (11/17/2008) 

C.S.A  Design-Certified 
Complies with ANSI Z21.13/CSA 4.9 
Gas-Fired Low Pressure Steam and Hot Water Boilers 
 

 

 
ASME Code, Section IV 
Certified by Harsco Industrial, Patterson-Kelley 
 

 

 
 
C.S.A  Design-Certified 
Complies with ANSI Z21.13/CSA 4.9 
Gas-Fired Low Pressure Steam and Hot Water Boilers 

Summary of Contents for C1050

Page 1: ...co Industrial Patterson Kelley 100 Burson Street East Stroudsburg PA 18301 Telephone 570 476 7261 Toll Free 877 728 5351 Facsimile 570 476 7247 www harscopk com MACH C750 C1050 Outdoor Boilers Rev 1 0...

Page 2: ...ges occurring in connection with the furnishing performance or use of this material TABLE OF CONTENTS MACH C750 C1050 Outdoor Boilers 1 Table of Contents 2 1 BOILER MODIFICATIONS 3 1 1 Completed Outdo...

Page 3: ...omplete the outdoor boiler These additional assemblies are listed in this manual and the MACH C750 C1050 Installation Owner s Manual Be sure to identify your boiler and its specific installation requi...

Page 4: ...l Installing a boiler or vent system using improper installation methods or materials can result in serious injury or death due to fire or asphyxiation from carbon monoxide or other poisonous gases Br...

Page 5: ...90 elbow item 1 to outlet of boiler and assemble gas shut off valve to the elbow This allows clearance for the air inlet stack Use approved pipe sealer that resists the action of Fuel Gases such as Na...

Page 6: ...the assembled inlet pipe over the inlet collar position pipe to be straight and parallel to the back of the boiler and secure using 3 6 x self tapping screws ITEM 8 evenly spaced around the pipe Sili...

Page 7: ...nless venting Below is a table containing the available adapter for each MACH boiler size Installer should use Adapters listed below or equivalent MACH Boiler Size Nominal Stack Size Stainless Adapter...

Page 8: ...on the 4 angle brackets inside the hood 3 The 4 rectangular spacers will be on the sides of the cabinet 4 Assemble the exhaust vent and place it through the hood then into the exhaust outlet on the b...

Page 9: ...section can be raised and placed behind the angle supports slowly lower the hood until it is supported by the top section For further instructions on installation see MACH C750 C1050 Installation Owne...

Page 10: ...ecirculation into the air inlet Flue gas recirculation indicates that the vent is not installed properly for local conditions 2 Check for freezing of the condensate lines Frozen lines will result in b...

Page 11: ...MACH C750 C1050 Outdoor Boilers 11 4 Assembly Drawing 4 1 ASSEMBLY DRAWING...

Page 12: ...2007 Harsco Corporation Printed 3 18 2011...

Reviews: